Project management, detailed engineering design, document review, revalidation and revision for MOPU “SAPARMYRAT” relocation.
General information
Client | COMPANY -Petronas Carigali (Turkmenistan) Sdn Bhd MAIN CONTRACTOR - DAR Energy |
Project | Provision Of Project Management, Detailed Engineering Design, Document Review, Revalidation And Revision For Mopu “Saparmyrat” Relocation |
Year | 2023 |
Location | Diyarbekir Field, Turkmenistan |
Vassels | Captain Lychkin |
Type of Service | Transportation & Installation |
Max. Water Depth | 60 Meter |
Scope of Work
- MOPU Weight Calculations Report
- MOPU Berthing Analysis
- MOPU Trim, Stability Calculations and Ballast Plan Report
- Watertight Integrity Procedure
- Mooring Chains & Anchors Recovery Procedure
- MOPU Jacking Towing Procedure
- Riser & Ancillaries Recovery Procedure
- MOPU Motion Calculations Report
- Fatigue Analysis for MOPU Tow Considering Fatigue Damage In-Service
- Geotechnical Analysis to Predict Required Pull Out Load
- MOPU Bollard Pull and Position Keeping Calculations
- MOPU Tow Connection Strength Verification
- MOPU Watertight Integrity Test Plan
- Alternative Leg Pull Out Method to Release Spud Can from Seabed
- MOPU Leg Strength and Jacking Analysis Report
- MOPU Leg Penetration Analysis
- MOPU Pinhole Strength Analysis Operation
- Mobilization & Demobilisation Statement