MOPU “SAPARMYRAT” RELOCATION

Project management, detailed engineering design, document review, revalidation and revision for MOPU “SAPARMYRAT” relocation.

General information​

Client

COMPANY -Petronas Carigali (Turkmenistan) Sdn Bhd

MAIN CONTRACTOR - DAR Energy

Project

Provision Of Project Management, Detailed Engineering Design, Document Review, Revalidation And Revision For Mopu “Saparmyrat” Relocation

Year

2023

Location

Diyarbekir Field, Turkmenistan

Vassels

Captain Lychkin

Type of Service

Transportation & Installation

Max. Water Depth

60 Meter

Scope of Work

  • MOPU Weight Calculations Report
  • MOPU Berthing Analysis
  • MOPU Trim, Stability Calculations and Ballast Plan Report
  • Watertight Integrity Procedure
  • Mooring Chains & Anchors Recovery Procedure
  • MOPU Jacking Towing Procedure
  • Riser & Ancillaries Recovery Procedure
  • MOPU Motion Calculations Report
  • Fatigue Analysis for MOPU Tow Considering Fatigue Damage In-Service
  • Geotechnical Analysis to Predict Required Pull Out Load
  • MOPU Bollard Pull and Position Keeping Calculations
  • MOPU Tow Connection Strength Verification
  • MOPU Watertight Integrity Test Plan
  • Alternative Leg Pull Out Method to Release Spud Can from Seabed
  • MOPU Leg Strength and Jacking Analysis Report
  • MOPU Leg Penetration Analysis
  • MOPU Pinhole Strength Analysis Operation
  • Mobilization & Demobilisation Statement