Transportation & Installation

Naval Architech

  • Transportation Analysis
  • Dynamic Lifting Analysis
  • Substructure Launching Analysis
  • Substructure Wet Tow Analysis
  • Substructure Floatation and Upending Analysis
  • Floating Structure Station Keeping Analysis
  • Mooring Analysis

Structure Engineering

  • Lifting Analysis
  • Transportation & Operation Using Default Motion
  • Structural check during Installation
  • Finite Element Analysis
  • Installation Aids Design

Pipeline Engineering

  • Static & Dynamic Pipelay Analysis (Start-up, Normal Lay & A&R)
  • Mid Point Tie in Analysis
  • Riser Stalk On & Lowering Analysis
  • Shore Approach / Beach Pull Analysis

Structure Installation

  • Jacket Lifting Installation
  • Jacket Launching
  • Topside Installation
  • Module/Module Support Frame (MSF)/ Helideck Installation
  • Installation
  • Flare Boom Installation
  • Bridge Installation
  • Jacket and Topside Loadout

Rigid Pipeline Installation

  • Shore Approach/Beach Pull
  • Rigid Pipelay
  • Pipeline Sideway
  • Mid-Point Tie-in
  • Pipeline Loadout

Subsea Umbilical, Riser, Flowline (SURF) Installation

  • Subsea umbilical’s, risers, flowlines and cables Installation
  • Composite cables/Fibre Optics Cables Installation
  • Flying Lead/Jumper Installation
  • Cable Transpooling and Loadout
  • Flowline/Umbilical/FOC reels Loadout

Subsea Construction Installation

  • Stalk-on Risers to pipeline using davits to Lift pipeline
  • Retrofit Risers & I/J Tube Installation
  • J-tube / I-tube Tube Installation
  • Subsea Sools Installation
  • Concrete Mattresses/Concrete Sleepers/Buckle Triggers Installation
  • Subsea structures, Pipeline End Termination (PLET), Pipeline End Manifold (PLEM), Subsea Valve Skids (SSVS) and Mid Water Arch Installation
  • Installation of Riser Guards, Boat Landings, Barge Bumpers
  • Pipeline Crossing and Freespan Rectification
  • Redundant Riser and Riser Clamp Removal Works
  • Riser and I/J-tube Installation
  • Riser Clamp/Riser Guard Clamp Installations
  • Subsea Structure Loadou

Pipeline Pre Commissioning

  • Flooding Gauging and Cleaning (FCG)
  • Baseline Survey
  • Hydrotest
  • Dewatering and Drying
  • Nitrogen Packing

FPSO/FSO Installation/Decommissioning

  • Mooring  Chain with Anchor Pile/Anchors Installation
  • Mooring Chain Pre-Tensioning
  • Mooring Chain Pull In/Hook Up
  • Final Mooring Chain Tensioning
  • FPSO/FSO Towing
  • Export Hose Installation
  • Mooring Chain Loadout

MOPU Installation/Decomissioning

  • MOPU Towing
  • MOPU Jacking
  • MOPU Watertight Integrity Test